Mass Changing of Event Times | WiseNetwork Oy

Mass Changing of Event Times

If a "recurring" event (for example, a weekly exercise class) has been added to the event management system, it is possible to change the times of all these events an masse if necessary.

​​​​​​​1. Open the event from the event management system whose start/end times you want to modify. The time can be corrected for other events as well through the "Performances" tab as shown in the picture.


2. Click the "To main event" button on the "Performances" tab.



3. Set the desired times in the event schedule and click "save".



​​​​​​​4. After saving, a window like the one shown in the picture opens. Here you can choose if you want to update the changes to other events as well.